CDC Services

Complying Development Certificate

Home / Services / Complying Development Certificate
📐

Fast-tracked approval for eligible developments - skip the council DA process and get started sooner.

Complying Development Certificate NSW & Sydney

Fast-Track Your Build Approval in Sydney

A Complying Development Certificate (CDC) is often a quicker and more affordable building approval route for homeowners, developers and builders in New South Wales. .
There is no council development application (DA) process, and if your project meets the set standards, a complying development certificate in NSW can be issued in as little as 10 to 20 days, depending on the type of work and the land.

At AllCert Group, NSW Fair Trading Accredited private certifiers based in Eastwood, Sydney. We specialize in CDC assessment and issuance across Greater Sydney and all of NSW. From granny flats and duplexes to new homes and commercial fit-outs, our experienced team navigates every step of the complying development certificate Sydney process with precision, transparency and speed. Want to know if you qualify and what it will cost? Request a free eligibility check and quote or call 02 9145 3959

What Is a Complying Development Certificate (CDC) in NSW?

A complying development certificate (CDC) is a fast-track building approval in NSW for straightforward projects that meet set standards. It combines planning approval and construction approval in one certificate, and it is issued by a private certifier or council without a development application.

A Complying Development Certificate (CDC) is a statutory building approval issued under the Environmental Planning and Assessment Act 1979 (NSW). A CDC may be issued by an accredited CDC private certifier, such as AllCert Group, or, in certain instances, by your local council without a formal council determination process like a development application.

The CDC pathway was created to streamline building approvals for low-risk, clearly defined residential and commercial developments that satisfy pre-set planning and building standards. Rather than subjecting straightforward projects to the full DA process, the NSW government identified specific categories of development that—provided they meet objective, numerical standards, can be approved with speed and certainty. People often search for “CDC complying development certificate” or just “CDC”. They mean the same thing.

Complying Development Certificate NSW

A complying development certificate in NSW simultaneously acts as both a planning approval and a construction approval. This means that once your CDC is issued, you do not need a separate Construction Certificate to commence works—the CDC itself provides the legal authority to build, subject to the conditions listed in the certificate and the accompanying Construction Certificate Schedule.

Does your project qualify? Not every property or project can use the CDC pathway. Eligibility depends on your zoning, lot size and shape, heritage or environmental constraints (such as bushfire or flood), and whether your design meets the numerical standards. A quick eligibility check before you finalise your design can save redesign costs later.

The Governing Planning Policies

The standards of eligibility and development to meet complying development in NSW are established in State Environmental Planning Policies (SEPPs), mainly the Exempt and Complying Development Codes SEPP 2008 (the “Codes SEPP”) and the Housing SEPP 2021. The main codes used for residential projects in Sydney and across NSW are:

SEPP / CodeDevelopment Types CoveredKey Timeframe
Codes SEPP — Low Rise Housing Diversity CodeDual occupancy (duplex), manor houses, terraces, townhouses on eligible lotsUp to 20 days
Codes SEPP — Housing CodeNew dwelling houses (1 & 2 storey), alterations & additions to houses10 days
(20 days where neighbour
notification applies)
Codes SEPP — Demolition CodeDemolition of existing structuresTypically 10 days
Codes SEPP — Rural
Housing Code
New homes and outbuildings on rural-zoned land10 or 20 days
Codes SEPP — Commercial and Industrial codesCertain commercial fit-outs, changes of use, ancillary structuresTypically 10 or 20 days

The certifiers of AllCert Group are well informed of all the relevant SEPPs and are well informed of any changes in legislation. We determine the right route and the relevant code to be used in your particular project even before an application is filed.

CDC vs DA in NSW — Understanding the Key Differences

One of the most common questions we receive at AllCert Group is: “Should my project go through a CDC or a DA?” The answer depends on the specific characteristics of your site and your proposed development. Here is a clear, practical comparison:

 
FactorDevelopment Application (DA)Complying Development Certificate (CDC)
Who determines it?Local council (or Sydney Planning Panels for large projects)Private certifier (AllCert Group) or council
TimeframeOften 70+ days on average, and longer for complex projects10 or 20 days (statutory)
Community notification?Yes — neighbours can objectLimited —neighbours may be notified for some codes, but there is no merit appeal or bjection process
Planning flexibility?High — can propose merit-based solutionsLow — must meet pre-set standards precisely
Construction Certificate needed after?Yes — separate CC required before buildingNo — CDC includes construction approval
CostHigher (council fees + longer process)Often lower (no DA fee, faster, but total cost depends on the project, see below)
Heritage constraintsCan be assessed on meritHeritage items/areas typically excluded
Certainty of outcomeUncertain — council may impose conditions or refuseHigh — if standards are met, certificate must be issued

Complying Development Certificate Cost in NSW — What Affects the Price?

There is no single price for a CDC, because every project and site is different. The certifier’s fee
depends mainly on:

  • Type of project: a new home, granny flat, duplex, extension or commercial fit-out each need different levels of assessment.
  • Size and complexity: the value of the work, number of storeys and number of dwellings.
  • The site: bushfire, flood, heritage, easements, referrals to other authorities and any extra reports needed.
  • Quality of your plans: complete, compliant drawings mean fewer revisions and less assessment time.
  • Certification scope: issuing the CDC only, or also staying on as Principal Certifier for inspections and the final occupation certificate.

Keep in mind that other costs sit alongside the certifier’s fee, such as design and engineering documents, BASIX, council or authority charges and levies, and your builder’s costs. A good quote should make clear what is included and what is not.

The quickest way to get an accurate number is to ask. A CDC is often cheaper than a DA, but the exact figure depends on your plans and your site, and a generic price range online can be well off. Tell us about your project and we will check eligibility and give you a free, no-obligation quote.

What to send for a fast quote: your property address, a short description of the project, and any plans or sketches you have. No plans yet? That is fine. Send the address and the idea, and we will tell you if the CDC pathway is realistic before you spend more on design.

What Development Can Be Approved Under a Complying Development Certificate?

The complying development certificate CDC pathway covers a wide range of residential and commercial development types across Sydney and NSW. Below are the most common project types that AllCert Group regularly approves through the CDC pathway:

Residential CDC — New Homes & Major Structures

  • New single-storey dwelling houses
  • New two-storey dwelling houses
  • Dual occupancy (side-by-side duplex)
  • Attached dual occupancy
  • Secondary dwellings (granny flats)
  • Manor houses (max. 4 dwellings)
  • Multi-dwelling housing (terraces/townhouses)
  • Rural homes and outbuildings

Residential CDC — Alterations, Extensions & Ancillary Structures

  • Single and double-storey home additions
  • Garage and carport construction
  • Swimming pools and spas
  • Decks, pergolas and verandahs
  • Sheds and outbuildings
  • Retaining walls
  • Fences and boundary structures
  • Demolition of existing buildings

Commercial CDC

  • Internal fit-outs and alterations to commercial and retail premises that meet applicable SEPP standards
  • Change of use of premises between compatible commercial uses
  • Signage and ancillary commercial structures in certain zones
  • Industrial buildings and warehouses of specified types and sizes

Not sure if your specific project is eligible for a complying development certificate Sydney approval? Then you just have to contact us for a no-obligation eligibility check. We review your site constraints, current zoning and proposed works against all applicable SEPPs and provide a clear, written recommendation within 24 business hours.

The AllCert Group CDC Process — Step by Step

We follow the same disciplined, transparent process for every complying development certificate application in Sydney and NSW. Your application usually needs a planning certificate for your lot, a site survey, architectural plans, a BASIX certificate and structural or stormwater details, depending on the project. We give you a project-specific list in step 2.

1. Free Eligibility Assessment

We review your site address, Section 10.7, zoning, constraints and proposed development type. We confirm CDC eligibility in writing and identify the applicable SEPP and code at no charge.

2. Tailored Documents Checklist

We provide a project-specific documentation checklist. We liaise directly with your architect, designer and engineers to ensure all documents are prepared to the correct standard before lodgement.

3. Formal Application & Assessment

We register and assess the full application against all applicable SEPP development standards and BCA / NCC 2022 Amendment 2 requirements. The statutory assessment clock starts upon receipt of a complete application.

4. Authority Referrals (Where Required)

Where required, we refer to the NSW Rural Fire Service, Sydney Water, Heritage NSW, or other relevant authorities and coordinate timely responses to keep the assessment on track.

5. CDC Issued & Planning Portal Registered

Once the development is confirmed as complying, we issue your Complying Development Certificate and Construction Certificate Schedule, and lodge on the NSW Planning Portal CDC system to ensure proper registration and compliance. You are ready to build.

6. Principal Certifier & Inspections

AllCert Group can remain as your Principal Certifier through construction — carrying out mandatory critical stage inspections and ultimately issuing your Occupation Certificate at project completion.

Speed without shortcuts

A CDC combines both planning and construction approval in one streamlined process. However, the criteria are strict – your proposal must fully comply with the relevant State Environmental Planning Policy (SEPP) and the Building Code of Australia (BCA). We conduct thorough assessments to determine if your project meets all the relevant standards. If it does, we’ll issue your CDC promptly. If not, we’ll explain why and offer advice on your next steps. We work closely with clients, designers and builders to ensure documentation is complete and accurate, avoiding unnecessary delays or rejections.

Case Studies

Residential Extension: A Sydney homeowner added a second storey. Construction started within weeks after obtaining a CDC and thousands in council fees were saved. Granny Flat Development: A family added an additional dwelling. Our guidance led to quick CDC approval bringing legal certainty and increased property value. Commercial Fit-Out: A small company made internal changes to satisfy safety requirements. The CDC process enabled renovations without lengthy council involvement.

What We Offer
Review of plans against SEPP and BCA requirements
Site inspections for compliance verification
Eligibility advice and documentation guidance
Issuing CDCs for residential, commercial and industrial projects
Coordination with councils and regulatory bodies
Typical turnaround: 10-20 business days

Frequently Asked Questions

A CDC combines planning and construction approval in a single process. Eligible projects can be approved within weeks rather than months.

Get Expert Advice

Ready to discuss your project?

Our team responds within 24 business hours with tailored guidance for your project.

Request a Free Quote →
🕐 Mon–Fri, 9am–5pm
Get Started Today

Ready to discuss your project?

Contact AllCert today. We respond within 24 business hours with clear, practical advice.